Events    
   
'Lejla ghat-tard' 2010

Organizer: Attard Local Council
Date: 04.09.2010
Venue: Attard

Equipment:

Main Stage;

  • Main system
    Long Throw speaker stack 2 (2 RT112 + 4 RL-118) + HK amprack with digital field control  + audio console + multicore
  • 2 x Self powered monitors on stage type QSC K12 1Kw
  • 2 x Cordless microphone -  Roving
  • 1 x Pioneer CDJ-1000MK3
  • 1 x Pioneer DJM-800
  • 1 x Truss Lighting Bridge 12mtrs
  • 4 x Moving head PR250 Pilot
  • 12 x Propar 600W with colour filter
  • 4 x Blonde fixture 2K
  • 1 x Licon console
  • 1 x Power Pack
  • 1 x Tour Haze II

Bedwin Area

  • Main system
    2 x QSC speakers on stands + audio mixer + multicore [Total 2Kw]
  • 3 x Monitor speakers QSC K12
  • 2 x Lights Stand 3.5mtrs
  • 5 x LEDs Par

The Drop-out Band

  • Main system
    Near field 2Hi's type VT115 on stands + 2 subs RL118 + audio console + multicore [Total 2.4Kw]
  • 4 x Monitor speaker type QSC K12 1KW
  • Mirophones for the band
  • 4 x Metal Halide 250W with straw colour correction.

DSC_0054.JPG

P1010128.JPG

P1010112.JPG



   
         
      Copyright 2007 - Transient Light & Sound Ltd. - All Rights Reserved